Walk in shower and toilet

hi everyone
was just wondering how long the council take to install a wet room,
They will be starting next week, they have a location within the property to place it.
we were supposed to have building plans but this never materialised and now they are ready to begin the work
Comments
-
I had a wet room installed, ( not by the council) it took 10 days to complete. It was an existing bathroom so everything was ripped out and all the old plaster and flooring removed.
1 -
Thank you
I hope it’s not going to drag on for months, especially as it’s council
0 -
The time it takes can depend on all sorts of factors mokki.
The first one my old people built took a bit over a fortnight, but they were replacing the floor.
The first I did took a few days because they pulled out the bath and installed a accessible cubicle.
The second took about ten days but that included removing a bath and tiling the floor.
The most recent took about 5 days and the floor was resurfaced.
Maybe about a week would be my guess.
Good luck
1 -
I've had it done twice through disability facilities grants over the past 20 years. Each time it was 2 weeks of working Monday to Friday. They provided me with a chemical toilet too, because the bathroom was completely out of bounds.
1 -
don't get mr started with this we had a fight with the local council to get my wet room installed with a toilet in and grab rails as they weren't having any of it. We had to extend what was the playroom and a snug and add an extra room in it for the bathroom.
We added a kitchenette, bedroom and living area to it as well because I was living upstairs in a bedroom but it wasn't working even though I had a stair lift because I used to push myself off it in an autistic meltdown so we decided to make me more independent and build me an flat next to my parents house.
fast forward a few years later we are deciding to redo it and are thinking about putting a bath in so if anyone has any suggestions I would appreciate it. I am also looking into supported living as well because I have always wanted to live away from home so if anyone knows where to start I would much appreciate it. Thank you.1 -
My wet-room took over 3 months to build and get kitted out..
I had to pay 100% of the cost, myself.
Here are a few photos of the build..
1
Categories
- All Categories
- 15.5K Start here and say hello!
- 7.3K Coffee lounge
- 89 Games den
- 1.7K People power
- 122 Announcements and information
- 24.1K Talk about life
- 5.8K Everyday life
- 426 Current affairs
- 2.4K Families and carers
- 873 Education and skills
- 1.9K Work
- 533 Money and bills
- 3.6K Housing and independent living
- 1.1K Transport and travel
- 627 Relationships
- 1.5K Mental health and wellbeing
- 2.5K Talk about your impairment
- 867 Rare, invisible, and undiagnosed conditions
- 923 Neurological impairments and pain
- 2.1K Cerebral Palsy Network
- 1.2K Autism and neurodiversity
- 39.9K Talk about your benefits
- 6K Employment and Support Allowance (ESA)
- 19.7K PIP, DLA, ADP and AA
- 8.5K Universal Credit (UC)
- 5.7K Benefits and income